Building settlement is one among the most risks faced in the construction industry that is mostly irreversible. Now, extreme care and precaution is taken in monitoring even the slightest movement that could be attributed to a case of settlement of building. Permanent targets are fixed on the building to be analysed so as to plot the variation of position and height of a point from datum over the total monitored period.